项目概述
缆车下坡阶段不消耗电能,此时需投入负载箱消耗多余电力,保障向缆车供电的发电系统稳定运行。
项目要素
| 说明 | |
| 项目地点 | Switzerland |
| 项目日期 | 2026.05 |
| 环境 | Altitude of 2500 meters |
| 产品规格 | 500kW 400Vac 50Hz |
| 数量 | 2 units |
| 应用场景 | Balancing the cable car power grid |
| 备注 | When the cable car is in the downhill phase, it does not consume electrical energy. At this time, our load needs to be engaged to consume the excess power, ensuring the stable operation of the power generation system supplying the cable car. |
负载箱技术规格
| 主要电气参数 | |
| 额定功率 | 500kW |
| 功率因数 | 1.0 |
| 额定电压 | 400Vac |
| 频率 | 50Hz. |
| 相数/线制 | 3P4W |
| 负载分辨率 | 1kW |
| 电压容差(短时运行) | +5% |
| 负载元件容差 | ± 3% |
| 负载连接 | Copper busbars |
| 控制电源 | Auxiliary |
| 控制电压 | 400Vac Enclosure Structure Canopy/ container Container |
| 噪音等级 | 85±3dB(A) |
| 尺寸(宽×深×高mm) | 1155*1205*1120 |
| 风道方向 | Horizontal |
| 风机数量 | 1 Air volume(m³/kW/hour) 70 |
| 便携性 | Castors*4 IP grade of control chamber 55 |
| 负载箱控制 | |
| 温度 | -20 °C to +50°C |
| 海拔 | ≦2000 m.a.s.l |
| 负载投切 | |
| 三极接触器 | |
| 数字仪表 | V/A/kW/Hz/Pf. |
| 连接接口 | RJ45 |
| 通讯方式 | Modbus TCP |
| 本地控制 | |
| HMI触摸屏 | |
| 远程控制 | PC based software |
| 保护功能 | |
| 风机过载保护 | |
| 风机低风量保护 | |
| 过热紧急切断 | |
| 控制回路断路器 | |
| 本地/远程控制互锁 | |
| 急停按钮 | |
| 其他电压降额功率 | 400Vac 500kW 380Vac 451kW 360Vac 405kW |